KV&O RS11 #431 switching out a couple bad orders.
Showing posts with label DD9C-2. Show all posts
Showing posts with label DD9C-2. Show all posts

Thursday, March 16, 2017

Locomotives & caboose ready for service

KV&O shop forces have been busy. Ready for service is 4 locomotives and a caboose. U5B Switcher #6000, DD9C-2 Transfer locomotives #6100, RS3M #6200, U25B #3480 and caboose #90052. Reason for the red KV&O locomotives are these are home built locomotives.







Tuesday, March 14, 2017

Center Cab Locomotive Part 4

Getting closer to being completed still a few more details to be added, then decaled and weathered.

Center Cab Locomotive Part 3

The center cab was eased out of the paint shop after its coat of primer has dried. The locomotive is ready for final paint.




Center Cab Locomotive Part 2

The center cab is out of the shops for a test run. A few more details will be added and a trip to the paint shop and she will be placed into service.


Center Cab Locomotive Part 1

Currently being fabricated at the shops is a center cab using EMD components. The locomotives will be used in hot metal transfer trains but will mostly be used to work the ore and coal docks. Dynamic braking will be installed due to the grade of the docks.

Current progress. Frame motor and wheels sets in place. Body and cab being constructed. The locomotive will probably be painted in the KV&O red representing experimental locomotives.


Wednesday, March 8, 2017

Electric arc furnace Part 1

While waiting for a couple parts to complete the blast furnace #2, crews turn their attention to the electric arc furnace. Just a few more odds and ends and she will be ready to put into service