KV&O RS11 #431 switching out a couple bad orders.
Showing posts with label Blast Furnace. Show all posts
Showing posts with label Blast Furnace. Show all posts

Friday, July 13, 2018

Transfer Cars at D&D Steel.

Couple transfer cars working the high line today. Two blast furnaces going keeps these transfer cars busy.


Monday, October 9, 2017

Layout 10-09-17

Not posted much in a while and not did much work on the layout. I do want to post a few new pictures from around the layout. Enjoy.











Wednesday, March 8, 2017

Blast Furnace Upgrades Part 2

Crews worked long into the night getting the #2 blast furnace ready to be fired up.



Blast Furnace Upgrades Part 1

Been putting this off for a while but last night I started adding a second blast furnace to D&D Mining and Steel. I had to move the #1 BF about 6 inches to allow for the stoves to the #2 BF. The roof sections will not be permanently attached but attached with magnets so it can be removed to be viewed on the inside. Had to relocate the blower house (spot undetermined yet). After the blast furnace, a 2nd ore bridge and 2nd hullett will be built.